Dump Truck Liners

Fabick® is pleased to announce the most Resilient, Wear Resistant, Strongest, and Far Superior Sprayed-on and Poured-on® liner on the market today. Fabick’s dump truck lining systems are designed to be tough enough for the most demanding applications. They have not only been designed to take the abuse from sand, gravel, rock, concrete, snow, and many others but also can handle. Below are some reasons that Fabick® Truck Liners are the answer to you liner needs.

Bonds Directly To The Metal
If you are looking to increase your profits and equipment performance, a Fabick® truck liner is the answer. Protect your investment from rust and abrasion while providing a durable, seamless, airtight surface that uses no bolts or hardware for installation. This liner is Sprayed and Poured-on®



Increase Slide and Reduce Material Build-Up
A custom Fabick® Liner covers every crevice and contour of your entire dump box. This unique polyurea material creates a smooth, seamless surface that promotes payload release while reducing material retention. Our customers and test report that Fabick® liners eliminate the use of expensive or hazardous release agents. They also say asphalt, aggregate, snow, sand, and top soil all release clean.


Repairable Wear Surface
A dump box is subjected to daily abrasive use. Let our product be that wear surface.  Like all wear surfaces, at some point, the high wear areas will need maintenance. Because our material is Sprayed and Poured-on®, these areas can be "spot repaired" elimination the need to reline the entire box. During the initial application, these areas are identified and additional material is applied to help ensure uniform wear.




New or Used
Not just for new boxes, this strong durable material is ideal for resurfacing used boxes that have been worn and need repair.  Dump truck floors eventually wear thin and sag between the support ribs.  The Fabick® process allows for leveling and restoration of the dump body floor. A Fabick® liner is also lighter and more cost effective alternative to a steel replacement.


Time Is Money
At Fabick®, we realize that delays are costly. Our process requires minimal downtime, and most applications can be completed in one day or two days. For more information please contact us at 608-242-1100 or Email: info@fabick.com





    © 2010 Fabick, Inc.